References
Ranteko Çevre Teknolojileri olarak hizmet vermiş olduğumuz bazı referanslarımıza aşağıdan ulaşabilirsiniz.
-
Electric production plant - 2008
80 t/ day Sludge dryer + 4 MW electric production plant: Inegol designated industrial zone
-
Sludge dewatering plant - 2013
25 t/ day Sludge dewatering plant : SİKA
-
Kemik Kırma ve Kurutma Tesisi – 2015
50 t/ day Bone crushing and drying plant : Marmara Yem
-
Biogas plant - 2011
250 KW/hour Biogas plant: İlci Çiftliği, İlci Holding – ( 200ton/ day animal waste)
-
Sludge drying plant- 2014
90 t/ day Sludge dryer plant: Inegol designated industrial zone
-
Sludge drying and incineration plant – 2020
250 t/day Sludge drying + 215 t/ day RDF + sludge incineration plant: Ekolojik Enerji (Çorlu, Tekirdağ) – 2020